Hamlin substation interconnection queue

0 active projects totaling 0 MW in the PJM queue, plus 2 with terminal status (shown grayed).

2 PJM queue filings name Hamlin as the point of interconnection, all in Wayne County, PA.

Target commercial operation dates as filed run from Dec 2023 to Jun 2024 (2 filings).

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatusTarget COD
AG2-611 Hamlin 12 kV 12 4.3 Solar Withdrawn Dec 2023
AH2-177 Hamlin 12 kV 12 0 Hybrid Withdrawn Jun 2024

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.