Queue IDProjectkVMWResourceStatus
C01-2229 Lackawanna - Hopatcong 500 kV 500 1,309.2 Hybrid Active
AB1-151 Paupack 230kV 230 550 Gas Withdrawn
C01-2208 Lakeville 69 kV 69 150 Battery Withdrawn
D05 Waymart WF 69 70 Wind In Service
P45A Thompson 115kV 115 24 Wind Withdrawn
AD2-127 East Carbondale-Lackawanna 69 kV 69 20 Battery Withdrawn
AB2-012 Blooming Grove to West Damascus 69 kV 69 19.9 Gas Withdrawn
AD2-152 Pocono 230 kV 230 17.6 Wind Withdrawn
Q02 Thompson 115kV 115 16 Wind Withdrawn
K21 Waymart 69 13 Wind In Service
AF1-139 Thompson 34.5 kV 34.5 12 Solar Withdrawn
V3-042 Thompson 115kV 115 10.9 Wind Withdrawn
AF2-294 Thompson 34.5 kV 34.5 10.2 Solar Suspended
AE1-051 East Carbondale-Lackawanna 69kV 69 10 Battery Withdrawn
R05 Thompson 115kV 115 10 Wind Withdrawn
AC1-071 Waymart Wind II 230 8.7 Wind Withdrawn
Y1-067 Peckville-Jackson 69kV 69 8.4 Wind Withdrawn
AA2-069A Peckville-Jackson 69kV 69 8 Wind Withdrawn
Y3-041 Peckville-Jackson 69kV 69 8 Wind Withdrawn
W3-102 East Carbondale-Lackawanna 69kV 69 5.7 Solar Withdrawn
X2-007 Peckville-Varden 69kV 69 5.7 Solar Withdrawn
AG1-333 Lake Como-Pine Mills 12.47 kV 12.5 4.4 Solar Withdrawn
AG2-611 Hamlin 12 kV 12 4.3 Solar Withdrawn
AG2-612 Lakeville 12 kV 12 4.3 Hybrid Withdrawn
AH2-094 Lakeville 12 kV II 12 2.9 Solar Withdrawn
AE2-243 East Carbondale 12.47 kV I 12.5 2.3 Wind Withdrawn
AE2-244 East Carbondale 12.47 kV II 12.5 2.3 Wind Withdrawn
D04 Archbald 69 1 Gas In Service
AF2-285 WA-Cohechton 1 12.5 0 Hybrid Withdrawn
Z2-107 Waymart Battery Energy Storage System 69 0 Battery Withdrawn