Indian River Units #3 & #4

PJM queue ID R73

Indian River Units #3 & #4 (R73) is listed in the PJM interconnection queue as a 5 MW coal project in Sussex County, DE. The filing names Indian River as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of December 10, 2008.

Queue IDR73
Project nameIndian River Units #3 & #4
Status (as published)In Service
SubstationIndian River
Point of interconnectionIndian River 138kV
CountySussex
StateDE
Voltage138 kV
Capacity5 MW
Resource (as published)Coal
Resource categoryCoal (normalized for filtering)
Target commercial operation2008-12-10
Source datasetserial

Same substation and county

Indian River substation: 10 requests in the PJM queue, 1 active totaling 5 MW.

Queue IDProjectMWResourceStatus
C01-1130Indian River 230 kV1,450.2GasWithdrawn
G29Indian River 138kV750GasWithdrawn
Q42Indian River630CoalWithdrawn
AH1-384Indian River 230kV380.7Offshore WindWithdrawn
AH1-277Indian River 230kV279Offshore WindWithdrawn
AG2-271Indian River 230 kV150BatteryWithdrawn
AH2-077Indian River 230 kV150BatteryWithdrawn
C01-1365Indian River 230 kV95.5WindWithdrawn
R72Indian River Units 3-418CoalDeactivated

Sussex, DE: 70 requests in the PJM queue, 7 active totaling 196.3 MW.

A substation with the same name is named in PJM transmission planning materials: Indian River (DPL, 1 mention).

Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy5
MW capacity5
MFO170

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first