Hopewell Cogeneration Facility (HCF) (Y2-074) is listed in the PJM interconnection queue as a 8 MW gas project in City of Hopewell, VA. The filing names Hopewell as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of June 1, 2013.

Queue IDY2-074
Project nameHopewell Cogeneration Facility (HCF)
Status (as published)In Service
SubstationHopewell
Point of interconnectionHopewell 230kV
CountyCity of Hopewell
StateVA
Voltage230 kV
Capacity8 MW
Resource (as published)Natural Gas
Resource categoryGas (normalized for filtering)
Target commercial operation2013-06-01
Source datasetserial

Same substation and county

Hopewell substation: 12 requests in the PJM queue, 3 active totaling 188 MW.

Queue IDProjectMWResourceStatus
C01-1643Hopewell 230 kV150BatteryActive
Y2-077Hopewell Cogeneration Facility (HCF)30GasIn Service
AB2-152Hopewell 230kV54GasWithdrawn
U2-057Hopewell 34.5kV47.6OtherWithdrawn
AH1-064Hopewell 34.5kV8BatteryWithdrawn
AH1-065Churchill Storage Solutions LLC8BatteryWithdrawn
R31Hopewell 230kV8GasWithdrawn
W2-009Hopewell 230kV8GasWithdrawn
AH1-066Churchill Storage Solutions LLC4BatteryWithdrawn
AE2-095Hopewell 26 kV0HybridWithdrawn
U1-032Hopewell 230kV0CoalDeactivated

City of Hopewell, VA: 10 requests in the PJM queue, 2 active totaling 38 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy8
MW capacity8
MFO401

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first