Hopewell Cogeneration Facility (HCF)
PJM queue ID Y2-074
Hopewell Cogeneration Facility (HCF) (Y2-074) is listed in the PJM interconnection queue as a 8 MW gas project in City of Hopewell, VA. The filing names Hopewell as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of June 1, 2013.
| Queue ID | Y2-074 |
|---|---|
| Project name | Hopewell Cogeneration Facility (HCF) |
| Status (as published) | In Service |
| Substation | Hopewell |
| Point of interconnection | Hopewell 230kV |
| County | City of Hopewell |
| State | VA |
| Voltage | 230 kV |
| Capacity | 8 MW |
| Resource (as published) | Natural Gas |
| Resource category | Gas (normalized for filtering) |
| Target commercial operation | 2013-06-01 |
| Source dataset | serial |
Same substation and county
Hopewell substation: 12 requests in the PJM queue, 3 active totaling 188 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| C01-1643 | Hopewell 230 kV | 150 | Battery | Active |
| Y2-077 | Hopewell Cogeneration Facility (HCF) | 30 | Gas | In Service |
| AB2-152 | Hopewell 230kV | 54 | Gas | Withdrawn |
| U2-057 | Hopewell 34.5kV | 47.6 | Other | Withdrawn |
| AH1-064 | Hopewell 34.5kV | 8 | Battery | Withdrawn |
| AH1-065 | Churchill Storage Solutions LLC | 8 | Battery | Withdrawn |
| R31 | Hopewell 230kV | 8 | Gas | Withdrawn |
| W2-009 | Hopewell 230kV | 8 | Gas | Withdrawn |
| AH1-066 | Churchill Storage Solutions LLC | 4 | Battery | Withdrawn |
| AE2-095 | Hopewell 26 kV | 0 | Hybrid | Withdrawn |
| U1-032 | Hopewell 230kV | 0 | Coal | Deactivated |
City of Hopewell, VA: 10 requests in the PJM queue, 2 active totaling 38 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 8 |
| MW capacity | 8 |
| MFO | 401 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.