City of Hopewell, VA interconnection queue

2 active projects totalling 38 MW in the PJM queue, plus 8 with terminal status (shown greyed).

2active projects
38active MW
10total filed
Queue IDProjectkVMWResourceStatus
AB2-152 Hopewell 230kV 230 54 Gas Withdrawn
U2-057 Hopewell 34.5kV 34.5 47.6 Other Withdrawn
Y2-077 Hopewell Cogeneration Facility (HCF) 230 30 Gas In Service
AH1-064 Hopewell 34.5kV 34.5 8 Battery Withdrawn
AH1-065 Churchill Storage Solutions LLC 34.5 8 Battery Withdrawn
R31 Hopewell 230kV 230 8 Gas Withdrawn
W2-009 Hopewell 230kV 230 8 Gas Withdrawn
Y2-074 Hopewell Cogeneration Facility (HCF) 230 8 Gas In Service
AH1-066 Churchill Storage Solutions LLC 34.5 4 Battery Withdrawn
U1-032 Hopewell 230kV 230 0 Coal Deactivated

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.