City of Hopewell, VA interconnection queue
2 active projects totalling 38 MW in the PJM queue, plus 8 with terminal status (shown greyed).
2active projects
38active MW
10total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AB2-152 | Hopewell 230kV | 230 | 54 | Gas | Withdrawn |
| U2-057 | Hopewell 34.5kV | 34.5 | 47.6 | Other | Withdrawn |
| Y2-077 | Hopewell Cogeneration Facility (HCF) | 230 | 30 | Gas | In Service |
| AH1-064 | Hopewell 34.5kV | 34.5 | 8 | Battery | Withdrawn |
| AH1-065 | Churchill Storage Solutions LLC | 34.5 | 8 | Battery | Withdrawn |
| R31 | Hopewell 230kV | 230 | 8 | Gas | Withdrawn |
| W2-009 | Hopewell 230kV | 230 | 8 | Gas | Withdrawn |
| Y2-074 | Hopewell Cogeneration Facility (HCF) | 230 | 8 | Gas | In Service |
| AH1-066 | Churchill Storage Solutions LLC | 34.5 | 4 | Battery | Withdrawn |
| U1-032 | Hopewell 230kV | 230 | 0 | Coal | Deactivated |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.