Raceway Solar

PJM queue ID AC2-188

Raceway Solar (AC2-188) is listed in the PJM interconnection queue as a 7.6 MW solar project in Kent County, DE. The filing names Harrington as its point of interconnection. PJM lists its status as “Under Construction”, with a target commercial operation date of August 1, 2027.

Queue IDAC2-188
Project nameRaceway Solar
Status (as published)Under Construction
SubstationHarrington
Point of interconnectionHarrington 69 kV
CountyKent
StateDE
Voltage69 kV
Capacity7.6 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Target commercial operation2027-08-01
Source datasetserial

Same substation and county

Harrington substation: 8 requests in the PJM queue, 4 active totaling 39 MW.

Queue IDProjectMWResourceStatus
C01-1949Harrington 69 kV20SolarActive
AC2-187Raceway Solar7.6SolarUnder Construction
AC2-186Raceway Solar3.8SolarUnder Construction
AI2-090Harrington 69 kV31SolarWithdrawn
AG1-464Harrington 69 kV20BatteryWithdrawn
AH1-574Harrington 69kV12SolarWithdrawn
AH1-575Harrington 69kV6SolarWithdrawn

Kent, DE: 34 requests in the PJM queue, 13 active totaling 320.2 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy20
MW capacity7.6
MFO50

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first