Conowingo substation interconnection queue

2 active projects totalling 60 MW in the PJM queue, plus 1 with terminal status (shown greyed).

2active projects
60active MW
3total filed
Queue IDProjectkVMWResourceStatus
Y3-120 Conowingo 230kV 230 45 Hydro Withdrawn
B46 Conowingo 230 36 Hydro In Service
R89 Conowingo Hydro Station n/r 24 Hydro In Service

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.