Conowingo substation interconnection queue
2 active projects totaling 60 MW in the PJM queue, plus 1 with terminal status (shown grayed).
3 PJM queue filings name Conowingo as the point of interconnection, all in Harford County, MD.
Target commercial operation dates as filed run from Nov 2003 to Jun 2016 (3 filings).
2active projects
60active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| Y3-120 | Conowingo 230kV | 230 | 45 | Hydro | Withdrawn | Jun 2016 |
| B46 | Conowingo | 230 | 36 | Hydro | In Service | Nov 2003 |
| R89 | Conowingo Hydro Station | n/r | 24 | Hydro | In Service | Dec 2010 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Harford County, MD
- Perryman: 7 active, 955 MW of 7 filed
- Graceton: none active of 8 filed
- Conastone - Peach Bottom: none active of 2 filed
- Rock Ridge: none active of 2 filed