Perryman substation interconnection queue
7 active projects totaling 955 MW in the PJM queue.
7 PJM queue filings name Perryman as the point of interconnection, all in Harford County, MD.
Target commercial operation dates as filed run from Jun 2001 to Dec 2029 (7 filings). 4 active filings target a date after November 27, 2026.
Transmission owner as filed: BGE (4 filings).
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| C01-1579 | Perryman 115 kV | 115 | 555 | Gas | Active | Dec 2029 |
| C01-1559 | Perryman 115 kV | 115 | 200 | Battery | Active | Jun 2029 |
| S32 | Perryman 6 Units 1-4 | n/r | 130 | Gas | In Service | Dec 2015 |
| C01-1555 | Perryman 115 kV | 115 | 25 | Battery | Active | Jun 2029 |
| C01-1557 | Perryman 115 kV | 115 | 25 | Battery | Active | Jun 2029 |
| G30 | Perryman 51 | 115 | 10 | Coal | In Service | Jun 2001 |
| T147 | Perryman Generating Unit 51 | n/r | 10 | Gas | In Service | Jun 2008 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
PJM planning mentions
A substation with the same name is named in PJM transmission planning materials: Perryman (BGE, 2 mentions).
Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.
Same name on other Substation Scout pages
Other sources that print a substation named “Perryman” in MD. They are matched by name and state only, so a page listed here may describe a different substation with the same name. Check the location and utility on each. Where a PJM planning record prints no state, the match is by name within the states the utility zone serves, which is weaker.
- Perryman: Expansion Tracker, PJM planning: APS state not printed
Other PJM queue substations in Harford County, MD
- Conowingo: 2 active, 60 MW of 3 filed
- Graceton: none active of 8 filed
- Conastone - Peach Bottom: none active of 2 filed
- Rock Ridge: none active of 2 filed