Rock Ridge substation interconnection queue

1 active project totalling 150 MW in the PJM queue, plus 1 with terminal status (shown greyed).

1active projects
150active MW
2total filed
Queue IDProjectkVMWResourceStatus
C01-1490 Rock Ridge 115 kV 115 150 Battery Active
AB2-140 Rock Ridge 13kV 13 1.1 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.