Substation Scout

Greensville County Solar Project

PJM queue ID AB2-174

Greensville County Solar Project (AB2-174) is listed in the PJM interconnection queue as a 42 MW solar project in Greensville County, VA. The filing names Emporia-Trego as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of December 31, 2020.

Queue IDAB2-174
Project nameGreensville County Solar Project
Status (as published)In Service
SubstationEmporia-Trego
Point of interconnectionEmporia-Trego 115kV
CountyGreensville
StateVA
Voltage115 kV
Capacity42 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Target commercial operation2020-12-31
Source datasetserial

Same substation and county

Emporia-Trego substation: 3 requests in the PJM queue, 1 active totaling 42 MW.

Queue IDProjectMWResourceStatus
AI2-391Emporia-Trego 115kV13SolarWithdrawn
AB1-070Emporia-Trego 115kV0SolarWithdrawn

Greensville, VA: 58 requests in the PJM queue, 14 active totaling 1,973.5 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy80
MW capacity42
MFO80

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.