Doremus substation interconnection queue

1 active project totalling 0.4 MW in the PJM queue, plus 1 with terminal status (shown greyed).

1active projects
0.4active MW
2total filed
Queue IDProjectkVMWResourceStatus
X2-087 Food Bank Solar 13 0.4 Solar In Service
AC1-037 Hillside Battery 13 0 Battery Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.