Tosco-VFT substation interconnection queue
0 active projects totaling 0 MW in the PJM queue, plus 2 with terminal status (shown grayed).
2 PJM queue filings name Tosco-VFT as the point of interconnection, all in Union County, NJ.
Target commercial operation dates as filed run from Jun 2016 to Jun 2019 (2 filings).
0active projects
0active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AA2-183 | Tosco-VFT 230kV | 230 | 230 | Gas | Withdrawn | Jun 2019 |
| Z1-109 | Tosco-VFT 230kV | 230 | 208 | Gas | Withdrawn | Jun 2016 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Union County, NJ
- Linden: 10 active, 1,980.1 MW of 20 filed
- Linden or: 2 active, 870 MW of 2 filed
- Linden VFT: 2 active, 315 MW of 2 filed
- Tosco: 2 active, 180 MW of 2 filed
- Doremus: 1 active, 0.4 MW of 2 filed
- East Towanda: none active of 5 filed