Dubois 34.5 kV
PJM queue ID C01-2127
Dubois 34.5 kV (C01-2127) is listed in the PJM interconnection queue as a 20 MW battery project in Clearfield County, PA. The filing names Dubois as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of December 31, 2028.
| Queue ID | C01-2127 |
|---|---|
| Project name | Dubois 34.5 kV |
| Status (as published) | Active |
| Substation | Dubois |
| Point of interconnection | Dubois 34.5 kV |
| County | Clearfield |
| State | PA |
| Voltage | 34.5 kV |
| Capacity | 20 MW |
| Resource (as published) | Storage |
| Resource category | Battery (normalized for filtering) |
| Target commercial operation | 2028-12-31 |
| Source dataset | cycle |
Same substation and county
Dubois substation: 2 requests in the PJM queue, 1 active totaling 20 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| AH2-401 | Dubois 34.5 kV | 12 | Solar | Withdrawn |
Clearfield, PA: 53 requests in the PJM queue, 11 active totaling 840.5 MW.
A substation with the same name is named in PJM transmission planning materials: Dubois (PENELEC, 5 mentions).
Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Developer | AM Energy Resources LLC |
|---|---|
| Transmission owner | PENELEC |
| Project type | Generation Interconnection |
| Cycle | C01 |
| Stage | Phase 1 |
| MW energy | 20.0 |
| MW capacity | 20.0 |
| MFO | 20.0 |
| Submitted date | 4/27/2026 |
| Last updated | 6/3/2026 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.