Clover substation interconnection queue
2 active projects totalling 118.7 MW in the PJM queue, plus 5 with terminal status (shown greyed).
2active projects
118.7active MW
7total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AF1-310 | Clover 230 kV | 230 | 114 | Solar | Withdrawn |
| AG2-270 | Clover 230 kV | 230 | 105 | Battery | Active |
| AF2-266 | Clover 230 kV | 230 | 50 | Battery | Withdrawn |
| S78 | Clover 230kV | 230 | 19 | Coal | Withdrawn |
| S77 | Clover 230kV | 230 | 16 | Coal | Withdrawn |
| Y2-076 | Clover Power Station Unit 1 | 230 | 13.7 | Coal | In Service |
| W4-001 | Clover | n/r | 5 | Solar | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.