Welco substation interconnection queue
1 active project totaling 12 MW in the PJM queue, plus 1 with terminal status (shown grayed).
2 PJM queue filings name Welco as the point of interconnection, all in Halifax County, VA.
Target commercial operation dates as filed run from Dec 2018 to Nov 2022 (2 filings).
1active projects
12active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AF1-058 | Watlington Solar | 34.5 | 12 | Solar | In Service | Nov 2022 |
| AD1-123 | Welco 34.5 kV | 34.5 | 6.6 | Solar | Withdrawn | Dec 2018 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Halifax County, VA
- Clover-Rawlings: 2 active, 420 MW of 4 filed
- Clover: 2 active, 118.7 MW of 7 filed
- Clover-Sedge Hill: 3 active, 104.5 MW of 3 filed
- Halifax-Person: 3 active, 84.8 MW of 3 filed
- Perth-Hickory Grove: 2 active, 51.1 MW of 2 filed
- Crystal Hill-Halifax: 2 active, 38.8 MW of 2 filed
- Dryburg: 2 active, 28.2 MW of 2 filed
- Crystal Hill - Perth: 1 active, 10.4 MW of 2 filed
- SedgeHill - Person: none active of 3 filed
- Sedge Hill: none active of 2 filed
- Sedge Hill - Person: none active of 2 filed
- Sinai: none active of 2 filed
- South Boston: none active of 2 filed
Site Scanner