Substation Scout

Pamplin-Chase City substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 2 with terminal status (shown greyed).

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
AG1-181 Pamplin-Chase City 115 kV 115 101.1 Solar Withdrawn
AG1-185 Pamplin-Chase City 115 kV 115 48.9 Battery Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.