South Boston substation interconnection queue
0 active projects totaling 0 MW in the PJM queue, plus 2 with terminal status (shown grayed).
2 PJM queue filings name South Boston as the point of interconnection, all in Halifax County, VA.
Target commercial operation dates as filed run from Dec 2022 to Sep 2026 (2 filings).
0active projects
0active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AI2-041 | South Boston 115kV | 115 | 75 | Battery | Withdrawn | Sep 2026 |
| AG1-287 | South Boston 12.5 kV | 12.5 | 9 | Solar | Withdrawn | Dec 2022 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Halifax County, VA
- Clover-Rawlings: 2 active, 420 MW of 4 filed
- Clover: 2 active, 118.7 MW of 7 filed
- Clover-Sedge Hill: 3 active, 104.5 MW of 3 filed
- Halifax-Person: 3 active, 84.8 MW of 3 filed
- Perth-Hickory Grove: 2 active, 51.1 MW of 2 filed
- Crystal Hill-Halifax: 2 active, 38.8 MW of 2 filed
- Dryburg: 2 active, 28.2 MW of 2 filed
- Welco: 1 active, 12 MW of 2 filed
- Crystal Hill - Perth: 1 active, 10.4 MW of 2 filed
- SedgeHill - Person: none active of 3 filed
- Sedge Hill: none active of 2 filed
- Sedge Hill - Person: none active of 2 filed
- Sinai: none active of 2 filed