Dryburg substation interconnection queue
2 active projects totalling 28.2 MW in the PJM queue.
2active projects
28.2active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AG1-342 | Staunton Solar | 115 | 21.6 | Solar | EP |
| AG2-262 | Dryburg 115 kV | 115 | 6.6 | Solar | Active |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.