Halifax-Person substation interconnection queue
3 active projects totaling 84.8 MW in the PJM queue.
3 PJM queue filings name Halifax-Person as the point of interconnection, all in Halifax County, VA.
Target commercial operation dates as filed run from Nov 2023 to Dec 2024 (3 filings).
3active projects
84.8active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AD1-058 | Alton Post Office Solar | 230 | 36.6 | Solar | In Service | Dec 2024 |
| AC2-100 | Powells Creek Solar | 230 | 33.6 | Solar | In Service | Nov 2023 |
| AC1-221 | Alton Post Office Solar | 230 | 14.6 | Solar | In Service | Dec 2024 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Halifax County, VA
- Clover-Rawlings: 2 active, 420 MW of 4 filed
- Clover: 2 active, 118.7 MW of 7 filed
- Clover-Sedge Hill: 3 active, 104.5 MW of 3 filed
- Perth-Hickory Grove: 2 active, 51.1 MW of 2 filed
- Crystal Hill-Halifax: 2 active, 38.8 MW of 2 filed
- Dryburg: 2 active, 28.2 MW of 2 filed
- Welco: 1 active, 12 MW of 2 filed
- Crystal Hill - Perth: 1 active, 10.4 MW of 2 filed
- SedgeHill - Person: none active of 3 filed
- Sedge Hill: none active of 2 filed
- Sedge Hill - Person: none active of 2 filed
- Sinai: none active of 2 filed
- South Boston: none active of 2 filed