Substation Scout

Sinai substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 2 with terminal status (shown greyed).

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
AH2-012 Sinai 12.47 kV 12.5 9.9 Hybrid Withdrawn
AI1-106 Sinai 13.2 kV 13.2 9.2 Hybrid Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.