Crystal Hill - Perth substation interconnection queue
1 active project totaling 10.4 MW in the PJM queue, plus 1 with terminal status (shown grayed).
2 PJM queue filings name Crystal Hill - Perth as the point of interconnection, all in Halifax County, VA.
Target commercial operation dates as filed run from Dec 2025 to Dec 2031 (2 filings). 1 active filing targets a date after November 27, 2026.
Transmission owner as filed: Dominion (2 filings).
1active projects
10.4active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AG2-260 | Crystal Hill - Perth 115 kV | 115 | 89.4 | Solar | Withdrawn | Dec 2025 |
| C01-1163 | Crystal Hill - Perth 115 kV | 115 | 10.4 | Solar | Active | Dec 2031 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Halifax County, VA
- Clover-Rawlings: 2 active, 420 MW of 4 filed
- Clover: 2 active, 118.7 MW of 7 filed
- Clover-Sedge Hill: 3 active, 104.5 MW of 3 filed
- Halifax-Person: 3 active, 84.8 MW of 3 filed
- Perth-Hickory Grove: 2 active, 51.1 MW of 2 filed
- Crystal Hill-Halifax: 2 active, 38.8 MW of 2 filed
- Dryburg: 2 active, 28.2 MW of 2 filed
- Welco: 1 active, 12 MW of 2 filed
- SedgeHill - Person: none active of 3 filed
- Sedge Hill: none active of 2 filed
- Sedge Hill - Person: none active of 2 filed
- Sinai: none active of 2 filed
- South Boston: none active of 2 filed