Crystal Hill - Perth substation interconnection queue

1 active project totalling 10.4 MW in the PJM queue, plus 1 with terminal status (shown greyed).

1active projects
10.4active MW
2total filed
Queue IDProjectkVMWResourceStatus
AG2-260 Crystal Hill - Perth 115 kV 115 89.4 Solar Withdrawn
C01-1163 Crystal Hill - Perth 115 kV 115 10.4 Solar Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.