Twittys Creek - Madisonville substation interconnection queue
3 active projects totaling 196.8 MW in the PJM queue.
3 PJM queue filings name Twittys Creek - Madisonville as the point of interconnection, all in Charlotte County, VA.
Target commercial operation dates as filed run from Dec 2028 to Dec 2030 (3 filings). 3 active filings target a date after November 27, 2026.
Transmission owner as filed: Dominion (3 filings).
3active projects
196.8active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AG2-442 | Twittys Creek - Madisonville 115 kV | 115 | 84 | Solar | Active | Dec 2028 |
| AG2-441 | Twittys Creek - Madisonville 115 kV | 115 | 67.8 | Solar | Active | Dec 2030 |
| AG2-440 | Twittys Creek - Madisonville 115 kV | 115 | 45 | Solar | Active | Dec 2030 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Charlotte County, VA
- Clover-Rawlings: 2 active, 420 MW of 4 filed
- Madisonville: 1 active, 150 MW of 2 filed
- Clover: 2 active, 118.7 MW of 7 filed
- Twittys Creek: 2 active, 8.6 MW of 2 filed
- Twitty's Creek: none active of 4 filed
- Central-Chase City: none active of 2 filed
- Pamplin-Chase City: none active of 2 filed
Site Scanner