Clover-Sedge Hill substation interconnection queue
3 active projects totaling 104.5 MW in the PJM queue.
3 PJM queue filings name Clover-Sedge Hill as the point of interconnection, all in Halifax County, VA.
Target commercial operation dates as filed run from Dec 2023 to May 2024 (3 filings).
3active projects
104.5active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AD1-152 | Piney Creek Solar | 230 | 48 | Solar | In Service | Dec 2023 |
| AD1-087 | Foxhound Solar | 230 | 43.7 | Solar | In Service | May 2024 |
| AD2-202 | Foxhound Solar | 230 | 12.8 | Solar | In Service | May 2024 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Halifax County, VA
- Clover-Rawlings: 2 active, 420 MW of 4 filed
- Clover: 2 active, 118.7 MW of 7 filed
- Halifax-Person: 3 active, 84.8 MW of 3 filed
- Perth-Hickory Grove: 2 active, 51.1 MW of 2 filed
- Crystal Hill-Halifax: 2 active, 38.8 MW of 2 filed
- Dryburg: 2 active, 28.2 MW of 2 filed
- Welco: 1 active, 12 MW of 2 filed
- Crystal Hill - Perth: 1 active, 10.4 MW of 2 filed
- SedgeHill - Person: none active of 3 filed
- Sedge Hill: none active of 2 filed
- Sedge Hill - Person: none active of 2 filed
- Sinai: none active of 2 filed
- South Boston: none active of 2 filed
Site Scanner