Cedar Creek 138 kV
PJM queue ID C01-1990
Cedar Creek 138 kV (C01-1990) is listed in the PJM interconnection queue as a 50 MW solar project in New Castle County, DE. The filing names Cedar Creek as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of November 1, 2028.
| Queue ID | C01-1990 |
|---|---|
| Project name | Cedar Creek 138 kV |
| Status (as published) | Active |
| Substation | Cedar Creek |
| Point of interconnection | Cedar Creek 138 kV |
| County | New Castle |
| State | DE |
| Voltage | 138 kV |
| Capacity | 50 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2028-11-01 |
| Source dataset | cycle |
Same substation and county
Cedar Creek substation: 4 requests in the PJM queue, 1 active totaling 50 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| AI2-089 | Cedar Creek 138 kV | 71 | Solar | Withdrawn |
| AG2-446 | Cedar Creek 138 kV | 25.3 | Solar | Withdrawn |
| AC1-095 | Cedar Creek 25kV | 3.8 | Solar | Withdrawn |
New Castle, DE: 65 requests in the PJM queue, 31 active totaling 1,405.6 MW.
A substation with the same name is named in PJM transmission planning materials: Cedar Creek (DPL, 3 mentions).
Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Developer | Freepoint Solar LLC |
|---|---|
| Transmission owner | DPL |
| Project type | Generation Interconnection |
| Cycle | C01 |
| Stage | Phase 1 |
| MW energy | 0.0 |
| MW capacity | 50.0 |
| MFO | 134.3 |
| Submitted date | 4/24/2026 |
| Last updated | 6/25/2026 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.