Keys Energy Center

PJM queue ID X4-035

Keys Energy Center (X4-035) is listed in the PJM interconnection queue as a 735.5 MW gas project in Prince George's County, MD. The filing names Burches Hill-Chalk Point as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of June 15, 2018.

Queue IDX4-035
Project nameKeys Energy Center
Status (as published)In Service
SubstationBurches Hill-Chalk Point
Point of interconnectionBurches Hill-Chalk Point 500kV
CountyPrince George's
StateMD
Voltage500 kV
Capacity735.5 MW
Resource (as published)Natural Gas
Resource categoryGas (normalized for filtering)
Target commercial operation2018-06-15
Source datasetserial

Same substation and county

Burches Hill-Chalk Point substation: 3 requests in the PJM queue, 2 active totaling 780 MW.

Queue IDProjectMWResourceStatus
Z1-052Keys Energy Center44.5GasIn Service
AH2-269ABurches Hill-Chalk Point 500kV45GasWithdrawn

Prince George's, MD: 57 requests in the PJM queue, 14 active totaling 3,551.2 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy735.5
MW capacity735.5
MFO735.5

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.