Meherrin Solar (AB2-031) is listed in the PJM interconnection queue as a 13.4 MW solar project in Greensville County, VA. The filing names Brink-Trego as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of April 1, 2022.

Queue IDAB2-031
Project nameMeherrin Solar
Status (as published)In Service
SubstationBrink-Trego
Point of interconnectionBrink-Trego 115kV
CountyGreensville
StateVA
Voltage115 kV
Capacity13.4 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Target commercial operation2022-04-01
Source datasetserial

Same substation and county

Brink-Trego substation: 3 requests in the PJM queue, 3 active totaling 40.4 MW.

Queue IDProjectMWResourceStatus
AB1-173Meherrin Solar13.5SolarIn Service
AB1-173AMeherrin Solar13.5SolarIn Service

Greensville, VA: 58 requests in the PJM queue, 14 active totaling 1,973.5 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy20
MW capacity13.4
MFO59.6

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first