Substation Scout

Du Page, IL interconnection queue

3 active projects totalling 96 MW in the PJM queue, plus 3 with terminal status (shown greyed).

3active projects
96active MW
6total filed
Queue IDProjectkVMWResourceStatus
AC1-111 Aurora Generation 138 36 Gas In Service
AC1-109 Aurora Generation 345 30 Gas In Service
AC1-110 Aurora Generation 138 30 Gas In Service
Q15 Woodridge 12kV 12 6.6 Gas Withdrawn
AD1-062 0 12.5 0 Battery Withdrawn
Z1-106 West Chicago Energy Storage 34 0 Battery Deactivated

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.