Permian I Solar

ERCOT queue ID 31INR0018

Queue ID31INR0018
Project namePermian I Solar
Status (as published)SS Completed, FIS Started, No IA
SubstationTap TNMP White Baker ()–Bottlebrush() 345-kV double-circuit
Point of interconnectionTap TNMP White Baker (38435)–Bottlebrush(38441) 345-kV double-circuit
CountyPecos
StateTX
VoltageNot reported
Capacity1,125.7 MW
Resource (as published)SOL/PV
Resource categorySolar (normalised for filtering)
Target commercial operation2030-06-30
Source datasetlarge

Additional filed fields

Interconnecting EntityS&S Renewables, LLC
Cdr ZoneWEST
Fuel CodeSOL
Technology CodePV
Screening Study Complete46070
Water AvailabilityNot Required

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.