Wisdom BESS SLF

ERCOT queue ID 27INR0440

Wisdom BESS SLF (27INR0440) is listed in the ERCOT interconnection queue as a 102.9 MW battery project in Pecos County, TX. The filing names Tap # HOLIDAY SUB TNP - # SOAPTREE TNP as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Completed, IA”, with a target commercial operation date of October 6, 2027. It records the screening study as complete on April 18, 2025, the full interconnection study as approved on October 9, 2025 and the interconnection agreement as signed on March 18, 2026.

Queue ID27INR0440
Project nameWisdom BESS SLF
Status (as published)SS Completed, FIS Completed, IA
SubstationTap # HOLIDAY SUB TNP - # SOAPTREE TNP
Point of interconnectionTap 138 kV #38455 HOLIDAY SUB TNP - 138 kV #38450 SOAPTREE TNP
CountyPecos
StateTX
Voltage138 kV
Capacity102.9 MW
Resource (as published)OTH/BA
Resource categoryBattery (normalized for filtering)
Target commercial operation2027-10-06
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Tap # HOLIDAY SUB TNP - # SOAPTREE TNP substation: 2 requests in the ERCOT queue, 2 active totaling 402.3 MW.

Queue IDProjectMWResourceStatus
27INR0438Wisdom Solar SLF299.4SolarSS Completed, FIS Completed, IA

Pecos, TX: 63 requests in the ERCOT queue, 58 active totaling 21,379.6 MW.

Tracked changes

1 change observed between weekly snapshots of the ERCOT queue since ERCOT tracking began on August 27, 2026. MW is nameplate as filed; for a capacity revision it is the change, not the new total.

DetectedChangeMWStatus was → now
2026-10-05 Status change n/a SS Completed, FIS Completed, No IA → SS Completed, FIS Completed, IA

Full change log →

Additional filed fields

Interconnecting entityWisdom Green Energy LLC
CDR reporting zoneWEST
Fuel codeOTH
Technology codeBA
Interconnection agreement signed2026-03-18
Screening study complete2025-04-18
Full interconnection study approved2025-10-09

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.