Midway substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 4 with terminal status (shown greyed).

0active projects
0active MW
4total filed
Queue IDProjectkVMWResourceStatus
AG2-358 Midway 345 kV 345 300 Battery Withdrawn
AH2-215 Midway 138 kV 138 120 Solar Withdrawn
AH2-220 Midway 138 kV 138 100 Battery Withdrawn
AG2-336 Midway 138 kV 138 48 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.