Midway substation interconnection queue
0 active projects totalling 0 MW in the PJM queue, plus 4 with terminal status (shown greyed).
0active projects
0active MW
4total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AG2-358 | Midway 345 kV | 345 | 300 | Battery | Withdrawn |
| AH2-215 | Midway 138 kV | 138 | 120 | Solar | Withdrawn |
| AH2-220 | Midway 138 kV | 138 | 100 | Battery | Withdrawn |
| AG2-336 | Midway 138 kV | 138 | 48 | Solar | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.