Wilton Center 345kV 345 kV (C01-1456) is listed in the PJM interconnection queue as a 100 MW battery project in Will County, IL. The filing names Wilton Center as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of June 29, 2029.

Queue IDC01-1456
Project nameWilton Center 345kV 345 kV
Status (as published)Active
SubstationWilton Center
Point of interconnectionWilton Center 345kV 345 kV
CountyWill
StateIL
Voltage345 kV
Capacity100 MW
Resource (as published)Storage
Resource categoryBattery (normalized for filtering)
Target commercial operation2029-06-29
Source datasetcycle

Same substation and county

Wilton Center substation: 5 requests in the PJM queue, 1 active totaling 100 MW.

Queue IDProjectMWResourceStatus
AD2-142Wilton Center52.8WindWithdrawn
AD2-140Wilton Center26.4WindWithdrawn
AD2-141Wilton Center26.3WindWithdrawn
AD2-139Wilton Center0SolarWithdrawn

Will, IL: 66 requests in the PJM queue, 22 active totaling 3,615.4 MW.

A substation with the same name is named in PJM transmission planning materials: Wilton Center (COMED, 6 mentions).

Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

DeveloperLincoln Bess, LLC
Transmission ownerComEd
Project typeGeneration Interconnection
CycleC01
StagePhase 1
MW energy100.0
MW capacity100.0
MFO100.0
Submitted date4/24/2026
Last updated6/10/2026

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first