Wayne 345 kV
PJM queue ID C01-1550
Wayne 345 kV (C01-1550) is listed in the PJM interconnection queue as a 530 MW battery project in Crawford County, PA. The filing names Wayne as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of September 30, 2030.
| Queue ID | C01-1550 |
|---|---|
| Project name | Wayne 345 kV |
| Status (as published) | Active |
| Substation | Wayne |
| Point of interconnection | Wayne 345 kV |
| County | Crawford |
| State | PA |
| Voltage | 345 kV |
| Capacity | 530 MW |
| Resource (as published) | Storage |
| Resource category | Battery (normalized for filtering) |
| Target commercial operation | 2030-09-30 |
| Source dataset | cycle |
Same substation and county
Wayne substation: 4 requests in the PJM queue, 1 active totaling 530 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| C01-1544 | Wayne 345 kV | 96.4 | Solar | Withdrawn |
| AF1-055 | Wayne 115 kV | 41.7 | Solar | Withdrawn |
| AE2-178 | Wayne 115 kV | 37.2 | Solar | Withdrawn |
Crawford, PA: 56 requests in the PJM queue, 9 active totaling 915.7 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Developer | ENGIE IR Holdings LLC |
|---|---|
| Transmission owner | PENELEC |
| Project type | Generation Interconnection |
| Cycle | C01 |
| Stage | Phase 1 |
| MW energy | 530.0 |
| MW capacity | 530.0 |
| MFO | 530.0 |
| Submitted date | 4/24/2026 |
| Last updated | 5/26/2026 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.