Wayne 345 kV

PJM queue ID C01-1550

Wayne 345 kV (C01-1550) is listed in the PJM interconnection queue as a 530 MW battery project in Crawford County, PA. The filing names Wayne as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of September 30, 2030.

Queue IDC01-1550
Project nameWayne 345 kV
Status (as published)Active
SubstationWayne
Point of interconnectionWayne 345 kV
CountyCrawford
StatePA
Voltage345 kV
Capacity530 MW
Resource (as published)Storage
Resource categoryBattery (normalized for filtering)
Target commercial operation2030-09-30
Source datasetcycle

Same substation and county

Wayne substation: 4 requests in the PJM queue, 1 active totaling 530 MW.

Queue IDProjectMWResourceStatus
C01-1544Wayne 345 kV96.4SolarWithdrawn
AF1-055Wayne 115 kV41.7SolarWithdrawn
AE2-178Wayne 115 kV37.2SolarWithdrawn

Crawford, PA: 56 requests in the PJM queue, 9 active totaling 915.7 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

DeveloperENGIE IR Holdings LLC
Transmission ownerPENELEC
Project typeGeneration Interconnection
CycleC01
StagePhase 1
MW energy530.0
MW capacity530.0
MFO530.0
Submitted date4/24/2026
Last updated5/26/2026

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.