Franklin Solar

PJM queue ID AF1-094

Franklin Solar (AF1-094) is listed in the PJM interconnection queue as a 12 MW solar project in Crawford County, PA. The filing names Union City-Cambridge Springs as its point of interconnection. PJM lists its status as “Under Construction”, with a target commercial operation date of December 31, 2026.

Queue IDAF1-094
Project nameFranklin Solar
Status (as published)Under Construction
SubstationUnion City-Cambridge Springs
Point of interconnectionUnion City-Cambridge Springs 34.5 kV
CountyCrawford
StatePA
Voltage34.5 kV
Capacity12 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Target commercial operation2026-12-31
Source datasetserial

Same substation and county

Union City-Cambridge Springs substation: 2 requests in the PJM queue, 1 active totaling 12 MW.

Queue IDProjectMWResourceStatus
AF2-237Union City-Cambridge Springs 34.5 kV6SolarWithdrawn

Crawford, PA: 56 requests in the PJM queue, 9 active totaling 915.7 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy20
MW capacity12
MFO20

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.