Burr Oak Solar (AG1-118) is listed in the PJM interconnection queue as a 180 MW solar project in DeKalb County, IL. The filing names Sugar Grove-Waterman as its point of interconnection. PJM lists its status as “EP”, with a target commercial operation date of March 21, 2030.
| Queue ID | AG1-118 |
|---|---|
| Project name | Burr Oak Solar |
| Status (as published) | EP |
| Substation | Sugar Grove-Waterman |
| Point of interconnection | Sugar Grove-Waterman 138kV |
| County | DeKalb |
| State | IL |
| Voltage | 138 kV |
| Capacity | 180 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2030-03-21 |
| Source dataset | cycle |
Same substation and county
Sugar Grove-Waterman substation: 2 requests in the PJM queue, 1 active totaling 180 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| AI2-408 | Sugar Grove-Waterman 138kV | 72 | Solar | Withdrawn |
DeKalb, IL: 40 requests in the PJM queue, 3 active totaling 435.7 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Developer | Burr Oak Solar, LLC |
|---|---|
| Transmission owner | ComEd |
| Project type | Generation Interconnection |
| Cycle | TC1 |
| Stage | FINAL AGREEMENT |
| MW energy | 300.0 |
| MW capacity | 180.0 |
| MFO | 300.0 |
| Submitted date | 8/31/2020 |
| Last updated | 10/7/2026 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.