Burr Oak Solar (AG1-118) is listed in the PJM interconnection queue as a 180 MW solar project in DeKalb County, IL. The filing names Sugar Grove-Waterman as its point of interconnection. PJM lists its status as “EP”, with a target commercial operation date of March 21, 2030.

Queue IDAG1-118
Project nameBurr Oak Solar
Status (as published)EP
SubstationSugar Grove-Waterman
Point of interconnectionSugar Grove-Waterman 138kV
CountyDeKalb
StateIL
Voltage138 kV
Capacity180 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Target commercial operation2030-03-21
Source datasetcycle

Same substation and county

Sugar Grove-Waterman substation: 2 requests in the PJM queue, 1 active totaling 180 MW.

Queue IDProjectMWResourceStatus
AI2-408Sugar Grove-Waterman 138kV72SolarWithdrawn

DeKalb, IL: 40 requests in the PJM queue, 3 active totaling 435.7 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

DeveloperBurr Oak Solar, LLC
Transmission ownerComEd
Project typeGeneration Interconnection
CycleTC1
StageFINAL AGREEMENT
MW energy300.0
MW capacity180.0
MFO300.0
Submitted date8/31/2020
Last updated10/7/2026

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first