Substation Scout

Hickory-Shawboro substation interconnection queue

1 active project totalling 84 MW in the PJM queue, plus 2 with terminal status (shown greyed).

1active projects
84active MW
3total filed
Queue IDProjectkVMWResourceStatus
AA1-139 Summit Farms Solar and Ranchland Solar 230 84 Solar In Service
AA1-133 Hickory-Shawboro 230kV 230 56 Solar Withdrawn
AG2-239 Hickory-Shawboro 230 kV 230 0 Battery Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.