Moyock substation interconnection queue

1 active project totalling 56 MW in the PJM queue, plus 1 with terminal status (shown greyed).

1active projects
56active MW
2total filed
Queue IDProjectkVMWResourceStatus
AF2-081 Currituck Solar 230 56 Solar EP
AI1-169 Moyock 230 kV 230 26.4 Hybrid Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.