Elizabeth City substation interconnection queue

1 active project totalling 13 MW in the PJM queue, plus 1 with terminal status (shown greyed).

1active projects
13active MW
2total filed
Queue IDProjectkVMWResourceStatus
AB2-022 Elizabeth City Solar 34.5 13 Solar In Service
AI2-300 Elizabeth City 34.5 kV 34.5 6.4 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.