Currituck, NC interconnection queue

6 active projects totalling 318.9 MW in the PJM queue, plus 11 with terminal status (shown greyed).

6active projects
318.9active MW
17total filed
Queue IDProjectkVMWResourceStatus
AH1-728 Not reported n/r 185 Battery Withdrawn
AD2-181 Shawboro-Sligo 230 kV 230 105 Solar Withdrawn
AE1-072 Shawboro Solar 230 98.6 Solar Under Construction
AA1-139 Summit Farms Solar and Ranchland Solar 230 84 Solar In Service
AA1-133 Hickory-Shawboro 230kV 230 56 Solar Withdrawn
AA2-156 Aydlett-Shawboro 230kV 230 56 Solar Withdrawn
AF2-081 Currituck Solar 230 56 Solar EP
AA1-132 Shawboro East Ridge Solar Park 230 42 Solar Withdrawn
AE2-253 Oak Trail Solar 230 34.5 Solar In Service
AD2-160 Oak Trail Solar 230 32.8 Solar In Service
AI1-169 Moyock 230 kV 230 26.4 Hybrid Withdrawn
W3-019 Fentress-Shawboro 230kV 230 19.5 Wind Withdrawn
AI2-393 Hickory-Moyock 230 kV 230 17.7 Solar Withdrawn
AA1-049 Shawboro East Ridge Solar Park 230 14 Solar Withdrawn
AH1-033 Sligo 34.5 kV 34.5 13 Solar Active
AC1-006 Aydlett 34.5kV 34.5 5.7 Solar Withdrawn
AG2-239 Hickory-Shawboro 230 kV 230 0 Battery Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.