Hickory-Moyock substation interconnection queue

2 active projects totalling 67.3 MW in the PJM queue, plus 1 with terminal status (shown greyed).

2active projects
67.3active MW
3total filed
Queue IDProjectkVMWResourceStatus
AE2-253 Oak Trail Solar 230 34.5 Solar In Service
AD2-160 Oak Trail Solar 230 32.8 Solar In Service
AI2-393 Hickory-Moyock 230 kV 230 17.7 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.