Home / PJM / substation / Hickory-Moyock
Hickory-Moyock substation interconnection queue
2 active projects
totalling 67.3 MW in the PJM queue, plus 1 with terminal status (shown greyed).
2 active projects
67.3 active MW
3 total filed
Queue ID Project kV MW Resource Status
AE2-253
Oak Trail Solar
230
34.5
Solar
In Service
AD2-160
Oak Trail Solar
230
32.8
Solar
In Service
AI2-393
Hickory-Moyock 230 kV
230
17.7
Solar
Withdrawn
A request with terminal status left the queue as filed.
That is a record of the filing, not evidence of injection capacity at this location.
Confirm deliverability with PJM before relying on these figures.
Site Scanner draws on HIFLD substations and electric retail service
territories, USGS watershed boundaries, FEMA flood hazard layers and US Census
geocoding. Queue data is compiled from public interconnection
queue filings. Every figure carries its source and retrieval date.
A withdrawal records that a request left the queue. It says
nothing about injection capacity at that location. Verify with the relevant ISO before
relying on any figure. Queue datasets are tracked separately and are
not directly comparable: status vocabularies, fuel coding, and publication
cadence all differ.
Screening aid only. Not a system impact study. Contiguous US.