Shawboro-Sligo substation interconnection queue

1 active project totalling 98.6 MW in the PJM queue, plus 3 with terminal status (shown greyed).

1active projects
98.6active MW
4total filed
Queue IDProjectkVMWResourceStatus
AD2-181 Shawboro-Sligo 230 kV 230 105 Solar Withdrawn
AE1-072 Shawboro Solar 230 98.6 Solar Under Construction
AA1-132 Shawboro East Ridge Solar Park 230 42 Solar Withdrawn
AA1-049 Shawboro East Ridge Solar Park 230 14 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.