Shawboro-Sligo substation interconnection queue
1 active project totaling 98.6 MW in the PJM queue, plus 3 with terminal status (shown grayed).
4 PJM queue filings name Shawboro-Sligo as the point of interconnection, all in Currituck County, NC.
Target commercial operation dates as filed run from Oct 2015 to Dec 2027 (4 filings). 1 active filing targets a date after November 27, 2026.
1active projects
98.6active MW
4total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AD2-181 | Shawboro-Sligo 230 kV | 230 | 105 | Solar | Withdrawn | Dec 2018 |
| AE1-072 | Shawboro Solar | 230 | 98.6 | Solar | Under Construction | Dec 2027 |
| AA1-132 | Shawboro East Ridge Solar Park | 230 | 42 | Solar | Withdrawn | Oct 2015 |
| AA1-049 | Shawboro East Ridge Solar Park | 230 | 14 | Solar | Withdrawn | Nov 2019 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Currituck County, NC
- Hickory-Shawboro: 1 active, 84 MW of 3 filed
- Hickory-Moyock: 2 active, 67.3 MW of 3 filed
- Moyock: 1 active, 56 MW of 2 filed
- Sligo: none active of 4 filed