Trexlertown substation interconnection queue
0 active projects totaling 0 MW in the PJM queue, plus 2 with terminal status (shown grayed).
2 PJM queue filings name Trexlertown as the point of interconnection, all in City of Lynchburg, VA.
Target commercial operation dates as filed run from Apr 2024 to Jun 2024 (2 filings).
0active projects
0active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AG2-389 | LH Church | 12 | 0 | Hybrid | Withdrawn | Apr 2024 |
| AH2-178 | Trexlertown 12 kV | 12 | 0 | Hybrid | Withdrawn | Jun 2024 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in City of Lynchburg, VA
- Reusens: 1 active, 4 MW of 3 filed
- Rohrsburg: none active of 3 filed
- West Berwick: none active of 3 filed
Site Scanner