West Berwick substation interconnection queue

0 active projects totaling 0 MW in the PJM queue, plus 3 with terminal status (shown grayed).

Target commercial operation dates as filed run from Dec 2022 to Jun 2024 (3 filings).

0active projects
0active MW
3total filed
Queue IDProjectkVMWResourceStatusTarget COD
AG1-204 West Berwick 12.47 kV 12.5 6.5 Solar Withdrawn Dec 2022
AH1-496 West Berwick 12 kV 12 6.4 Solar Withdrawn Jun 2024
AG2-395 CO-Ridge 12 0 Hybrid Withdrawn Apr 2024

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Other PJM queue substations in Columbia County, PA

All 35 PJM queue filings in Columbia County, PA.

Other PJM queue substations in City of Lynchburg, VA

All 7 PJM queue filings in City of Lynchburg, VA.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first