City of Lynchburg, VA interconnection queue
1 active project totalling 4 MW in the PJM queue, plus 6 with terminal status (shown greyed).
1active projects
4active MW
7total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AG2-202 | Reusens 12.47 kV | 12.5 | 20 | Battery | Withdrawn |
| AG2-203 | Perkins Park 12.47 kV | 12.5 | 20 | Battery | Withdrawn |
| Y3-119 | E. Lynchburg-Peaks View 34.5kV | 34.5 | 7 | Other | Withdrawn |
| AB2-109 | Reusens Hydro Electric Generating Plant | 34.5 | 4 | Hydro | In Service |
| AG2-389 | LH Church | 12 | 0 | Hybrid | Withdrawn |
| AG2-394 | CO-Zaners Rohrsburg | 12 | 0 | Hybrid | Withdrawn |
| AG2-395 | CO-Ridge | 12 | 0 | Hybrid | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.