City of Lynchburg, VA interconnection queue

1 active project totalling 4 MW in the PJM queue, plus 6 with terminal status (shown greyed).

1active projects
4active MW
7total filed
Queue IDProjectkVMWResourceStatus
AG2-202 Reusens 12.47 kV 12.5 20 Battery Withdrawn
AG2-203 Perkins Park 12.47 kV 12.5 20 Battery Withdrawn
Y3-119 E. Lynchburg-Peaks View 34.5kV 34.5 7 Other Withdrawn
AB2-109 Reusens Hydro Electric Generating Plant 34.5 4 Hydro In Service
AG2-389 LH Church 12 0 Hybrid Withdrawn
AG2-394 CO-Zaners Rohrsburg 12 0 Hybrid Withdrawn
AG2-395 CO-Ridge 12 0 Hybrid Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.