Rohrsburg substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 3 with terminal status (shown greyed).

0active projects
0active MW
3total filed
Queue IDProjectkVMWResourceStatus
AF2-203 Rohrsburg 12.5 kV 12.5 12 Solar Withdrawn
AG2-394 CO-Zaners Rohrsburg 12 0 Hybrid Withdrawn
AH2-180 Rohrsburg 12 kV 12 0 Hybrid Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.