Lake, IN interconnection queue

1 active project totaling 84.3 MW in the PJM queue, plus 2 with terminal status (shown grayed).

1active projects
84.3active MW
3total filed
Queue IDProjectkVMWResourceStatus
Y3-063 State Line 138kV 138 1,161 Gas Withdrawn
AI2-023 Lake - 270888 345kV 345 200 Battery Withdrawn
AE2-045 Bottlebrush Solar 345 84.3 Solar Under Construction

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.