Lake, IN interconnection queue
1 active project totalling 84.3 MW in the PJM queue, plus 2 with terminal status (shown greyed).
1active projects
84.3active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| Y3-063 | State Line 138kV | 138 | 1,161 | Gas | Withdrawn |
| AI2-023 | Lake - 270888 345kV | 345 | 200 | Battery | Withdrawn |
| AE2-045 | Bottlebrush Solar | 345 | 84.3 | Solar | Engineering and Procurement |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.