Bottlebrush Solar
PJM queue ID AE2-045
Bottlebrush Solar (AE2-045) is listed in the PJM interconnection queue as a 84.3 MW solar project in Lake County, IN. The filing names Olive-Reynolds as its point of interconnection. PJM lists its status as “Under Construction”, with a target commercial operation date of September 30, 2029.
| Queue ID | AE2-045 |
|---|---|
| Project name | Bottlebrush Solar |
| Status (as published) | Under Construction |
| Substation | Olive-Reynolds |
| Point of interconnection | Olive-Reynolds 345 kV |
| County | Lake |
| State | IN |
| Voltage | 345 kV |
| Capacity | 84.3 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2029-09-30 |
| Source dataset | serial |
Same substation and county
Olive-Reynolds substation: 6 requests in the PJM queue, 2 active totaling 264.3 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| AF1-215 | Mammoth North Solar Project | 180 | Solar | In Service |
| AI2-198 | Olive-Reynolds 345 kV | 108 | Solar | Withdrawn |
| AI2-199 | Olive-Reynolds 345 kV | 108 | Solar | Withdrawn |
| AD2-132 | Olive-Reynolds 345kV | 35.2 | Wind | Withdrawn |
| AC2-080 | Olive-Reynolds 345kV | 26 | Wind | Withdrawn |
Lake, IN: 3 requests in the PJM queue, 1 active totaling 84.3 MW.
Tracked changes
1 change observed between weekly snapshots of the PJM queue since PJM tracking began on August 27, 2026. MW is nameplate as filed; for a capacity revision it is the change, not the new total.
| Detected | Change | MW | Status was → now |
|---|---|---|---|
| 2026-10-26 | Status change | n/a | Engineering and Procurement → Under Construction |
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 200 |
| MW capacity | 84.28 |
| MFO | 200 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.