Bottlebrush Solar (AE2-045) is listed in the PJM interconnection queue as a 84.3 MW solar project in Lake County, IN. The filing names Olive-Reynolds as its point of interconnection. PJM lists its status as “Under Construction”, with a target commercial operation date of September 30, 2029.

Queue IDAE2-045
Project nameBottlebrush Solar
Status (as published)Under Construction
SubstationOlive-Reynolds
Point of interconnectionOlive-Reynolds 345 kV
CountyLake
StateIN
Voltage345 kV
Capacity84.3 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Target commercial operation2029-09-30
Source datasetserial

Same substation and county

Olive-Reynolds substation: 6 requests in the PJM queue, 2 active totaling 264.3 MW.

Queue IDProjectMWResourceStatus
AF1-215Mammoth North Solar Project180SolarIn Service
AI2-198Olive-Reynolds 345 kV108SolarWithdrawn
AI2-199Olive-Reynolds 345 kV108SolarWithdrawn
AD2-132Olive-Reynolds 345kV35.2WindWithdrawn
AC2-080Olive-Reynolds 345kV26WindWithdrawn

Lake, IN: 3 requests in the PJM queue, 1 active totaling 84.3 MW.

Tracked changes

1 change observed between weekly snapshots of the PJM queue since PJM tracking began on August 27, 2026. MW is nameplate as filed; for a capacity revision it is the change, not the new total.

DetectedChangeMWStatus was → now
2026-10-26 Status change n/a Engineering and Procurement → Under Construction

Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy200
MW capacity84.28
MFO200

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first