Jasper, IN interconnection queue
0 active projects totalling 0 MW in the PJM queue, plus 3 with terminal status (shown greyed).
0active projects
0active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AE1-211 | Reynolds 345 kV | 345 | 40 | Wind | Withdrawn |
| AC2-080 | Olive-Reynolds 345kV | 345 | 26 | Wind | Withdrawn |
| U4-003 | Olive-Dequine 345kV | 345 | 26 | Wind | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.