Mammoth North Solar Project
PJM queue ID AF1-215
Mammoth North Solar Project (AF1-215) is listed in the PJM interconnection queue as a 180 MW solar project in Starke County, IN. The filing names Olive-Reynolds as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of July 31, 2024.
| Queue ID | AF1-215 |
|---|---|
| Project name | Mammoth North Solar Project |
| Status (as published) | In Service |
| Substation | Olive-Reynolds |
| Point of interconnection | Olive-Reynolds 345 kV |
| County | Starke |
| State | IN |
| Voltage | 345 kV |
| Capacity | 180 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2024-07-31 |
| Source dataset | serial |
Same substation and county
Olive-Reynolds substation: 6 requests in the PJM queue, 2 active totaling 264.3 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| AE2-045 | Bottlebrush Solar | 84.3 | Solar | Under Construction |
| AI2-198 | Olive-Reynolds 345 kV | 108 | Solar | Withdrawn |
| AI2-199 | Olive-Reynolds 345 kV | 108 | Solar | Withdrawn |
| AD2-132 | Olive-Reynolds 345kV | 35.2 | Wind | Withdrawn |
| AC2-080 | Olive-Reynolds 345kV | 26 | Wind | Withdrawn |
Starke, IN: 6 requests in the PJM queue, 3 active totaling 366 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 300 |
| MW capacity | 180 |
| MFO | 300 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.