Dequine substation interconnection queue

1 active project totalling 88.4 MW in the PJM queue, plus 6 with terminal status (shown greyed).

1active projects
88.4active MW
7total filed
Queue IDProjectkVMWResourceStatus
AG1-555 Rainbow Trout 345 88.4 Hybrid Engineering and Procurement
AG2-344 Dequine 345 bkV 345 78 Battery Withdrawn
AD1-137 Dequine 345 kV 345 65 Wind Withdrawn
AD2-015 Dequine 345 kV 345 65 Wind Withdrawn
U1-087 Dequine 345kV 345 19.5 Wind Withdrawn
U1-088 Dequine 345kV 345 13 Wind Withdrawn
Y2-084 Dequine 345kV 345 3.3 Battery Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.