Fowler Ridge 4 WF

PJM queue ID Q03

Fowler Ridge 4 WF (Q03) is listed in the PJM interconnection queue as a 50 MW wind project in Benton County, IN. The filing names Olive-Dequine as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of December 31, 2014.

Queue IDQ03
Project nameFowler Ridge 4 WF
Status (as published)In Service
SubstationOlive-Dequine
Point of interconnectionOlive-Dequine 345kV
CountyBenton
StateIN
Voltage345 kV
Capacity50 MW
Resource (as published)Wind
Resource categoryWind (normalized for filtering)
Target commercial operation2014-12-31
Source datasetserial

Same substation and county

Olive-Dequine substation: 12 requests in the PJM queue, 4 active totaling 221.8 MW.

Queue IDProjectMWResourceStatus
Q01Fowler Ridge WF100WindIn Service
T126Meadow Lake WF II, Meadow Lake WF III40WindIn Service
T127Meadow Lake WF 4 - 531.8WindIn Service
S31Olive-Dequine 345kV90WindWithdrawn
AI2-096Olive-Dequine 345kV54WindWithdrawn
AI2-094Olive-Dequine 345kV53.5WindWithdrawn
AI2-095Olive-Dequine 345kV50.3WindWithdrawn
AI2-097Olive-Dequine 345kV45.3WindWithdrawn
T183Olive-Dequine 345kV40WindWithdrawn
T184Olive-Dequine 345kV40WindWithdrawn
U4-003Olive-Dequine 345kV26WindWithdrawn

Benton, IN: 11 requests in the PJM queue, 4 active totaling 238.7 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy250
MW capacity50
MFO250

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first